Battery / Hybrid Backup Sizing

Size a battery bank for a critical load and an autonomy target, then check how long the generator takes to recharge it.

Inputs

Inputs and assumptions

Result

Battery capacity to install
—
Discharge C-rate
—
Inverter continuous rating
—
Recharge time from empty
—

What to check

  • Critical load list with measured runtimes
  • Inverter and battery data sheet depth of discharge and round-trip efficiency

Related calculators

Screening-grade sizing. Manufacturer load-acceptance curves, ISO 8528-5 transient limits, and the adopted electrical code edition govern the final selection; an engineer signs off before hardware is ordered.

Saved calculations

Keep the assumptions with the result.

Save this calculation to return to the inputs, result, and report anytime.

Sign in or create an account to save this calculation.