Commercial Generator Project Budget
Turnkey budget for a commercial set: equipment, switchgear, ATS, fuel system, enclosure, exhaust, controls, engineering, and labor.
Result
Transfer switches
—
Budget per kW
—
Engineering and commissioning
—
Generator and enclosure
—
High end of the range
—
Fuel, enclosure, concrete, exhaust, controls
—
Installation labor
—
Low end of the range
—
Switchgear and distribution
—
Total project budget
—
Formula
Calculation logicWhat to check
- Vendor quotes for switchgear, fuel system, and enclosure
- Site logistics: crane access, trenching, and outage windows
Related calculators
Calculator
Exhaust Pipe Sizing & Backpressure
Exhaust flow, gas velocity, and estimated backpressure for a run with bends, against the engine's allowable limit.
Open calculatorCalculator
Generator Availability Calculator
Turn MTBF, repair time, and test hours into availability and the expected hours a site is left unserved.
Open calculatorCalculator
Parallel & N+1 Redundancy Sizer
How many sets in parallel for the load, what each carries, and what still runs with one set down.
Open calculatorCalculator
Permit & Inspection Checklist
Count the approvals a generator install triggers and estimate the fee load before the municipality tells you.
Open calculatorSaved calculations
Keep the assumptions with the result.
Save this calculation to return to the inputs, result, and report anytime.
Sign in or create an account to save this calculation.