Skip to content

Load Bank Test Planner

Load bank size, applied load percentage, fuel burned, and rental cost for a proper loaded test instead of a no-load run.

Inputs

Inputs and assumptions

What you can actually transfer onto the set during the test.

Percentage of nameplate the test should reach.

Result

Applied load during the test
—
Fuel burned during the test
—
Load bank capacity to rent
—
Load bank rental
—
Building load alone
—
Target test load
—

What to check

  • Load bank size and cable length available in your area
  • The minimum load the engine manufacturer requires

Related calculators

Maintenance figures are planning estimates. The engine manufacturer's service schedule, the adopted editions of NFPA 70 and NFPA 110, and the local jurisdiction's amendments govern what you must actually do and document.

Saved calculations

Keep the assumptions with the result.

Save this calculation to return to the inputs, result, and report anytime.

Sign in or create an account to save this calculation.