Transfer Switch Sizing
Pick the ATS amperage, pole count, and rating type from the load and the service configuration.
Result
Transfer switch rating
—
Load current
—
Floor set by the service rating
—
Switched poles to specify
—
Formula
Calculation logicWhat to check
- Utility service and disconnect arrangement
- Whether the generator is a separately derived system
Related calculators
Calculator
Commercial Generator Project Budget
Turnkey budget for a commercial set: equipment, switchgear, ATS, fuel system, enclosure, exhaust, controls, engineering, and labor.
Open calculatorCalculator
Exhaust Pipe Sizing & Backpressure
Exhaust flow, gas velocity, and estimated backpressure for a run with bends, against the engine's allowable limit.
Open calculatorCalculator
Generator Availability Calculator
Turn MTBF, repair time, and test hours into availability and the expected hours a site is left unserved.
Open calculatorCalculator
Parallel & N+1 Redundancy Sizer
How many sets in parallel for the load, what each carries, and what still runs with one set down.
Open calculatorSaved calculations
Keep the assumptions with the result.
Save this calculation to return to the inputs, result, and report anytime.
Sign in or create an account to save this calculation.